Regulates the 20-year support mechanism (DM FER-X Definitivo) for electricity generation from renewable energy plants (photovoltaic, wind, hydroelectric, and sewage gas) up to 1 MW. The incentive is provided through two-way contracts for difference or, for capacities below 200 kW, via an all-inclusive feed-in tariff with energy purchase by the GSE.
For Ustica: May be of interest to the Municipality of Ustica and other local public bodies to obtain a 20-year incentive or an all-inclusive feed-in tariff for electricity generation from renewable energy plants (such as photovoltaics) up to 1 MW.
Who can apply
Owners/operators of renewable energy plants with a capacity of up to 1 MW that have entered into operation (the factsheet specifically indicates Public Bodies).
Funding
20-year incentive calculated as a two-way contract on the energy price or an all-inclusive feed-in tariff for plants under 200 kW (overall national limit of 10 GW).
Deadline
2026-12-31
How to apply
Direct access application to be submitted to the GSE after the plant enters into operation, using the online channels on the GSE portal.